Merci de désactiver le bloqueurs de pub pour visualiser cette vidéo.

Article 212-34 into force since

  • Version into force since
ELI : /en/eli/fr/aai/amf/rg/article/212-34/20191122/notes

Forty-five days before the scheduled date of the first extraordinary general meeting called to authorise a merger, demerger or partial mergers operation, or forty-five days before the the operation completion date if no general meeting is required to authorise it, the document allowing the waiver of a prospectus and referred to in Article L. 621-8 of the Monetary and Financial Code is transmitted to the AMF.

This document contains the information and is made available to the public in accordance with the procedures specified by an instruction, no less than fifteen days for partial mergers or one month for mergers or demergers before the extraordinary general meeting called to authorise the operation or before the the operation completion date if no general meeting is required to authorise it.

The provisions of this article only apply to operations that fall within the scope of Article L. 621-8 IV of the Monetary and Financial Code.